10  The Economics of a Development Program

A single trial is one step in a program, and its value is the value of the option it opens on the next step. The chapter places the trial in that program. It first sets out the costs, the attrition and the valuation of a program, and then follows one hypothetical program through the sequence of decisions a sponsor faces: the dose, the go or no go, the size of the pivotal trial, the monitoring, the label and the price. Each decision changes the information available for the next. At each stage we compute the posterior that summarizes what is known and, where the decision turns on cost and benefit, the expected value that guides it. The drug is an oral agent for a chronic inflammatory disease, the numbers are invented but plausible, and the point is the bookkeeping: posteriors carried forward from stage to stage, in place of a series of disconnected significance tests.

10.1 Costs, attrition and time

DiMasi, Grabowski, and Hansen (2016) estimated the capitalized cost of bringing a new drug to approval at roughly 2.6 billion dollars (2013 dollars), most of it the cost of failures and of capital tied up over a decade of development. Moore et al. (2018) estimated the cost of the pivotal trials themselves for drugs approved in 2015 and 2016. Wong, Siah, and Lo (2019) estimated phase transition probabilities from over 400,000 trial records. Their estimates enter one identity, derived for a two phase program in Equation 13.1: the cost per approval is the expected cost per start divided by the probability of approval. Because the probability of approval is small, the cost per approval is several times the cost of a successful program.

10.2 Risk adjusted net present value

The sponsor values a program by

\[ \mathrm{rNPV} = \sum_t \frac{\Pr(\text{program alive at } t)\,\mathrm{CF}_t}{(1+r)^t}, \tag{10.1}\]

where \(\mathrm{CF}_t\) is the cash flow in year \(t\), \(r\) is the discount rate, and the survival probabilities are products of phase transition probabilities. Once those probabilities are posterior probabilities, updated as each trial reads out, rNPV is a Bayesian quantity. Its changes at each readout correspond to the jumps an investor sees in the share price of a biotech company.

10.3 The program as a real option

Each phase buys information and the right, not the obligation, to continue. Abandonment has value: a program that will be stopped when the posterior is bad is worth more than one that will be pushed through regardless. The Phase II to III transition is the dominant decision because it is where the cheap experiment determines whether the expensive one is run.

10.4 Portfolios and the patent clock

Programs that share a mechanism or a target have correlated outcomes, and a hierarchical prior across the pipeline lets a failure in one update the others. Budish, Roin, and Williams (2015) show that because patent terms run from filing rather than approval, long horizon endpoints are penalized, pushing sponsors toward surrogates. Any reform that tightens analytic discipline without addressing the clock pushes further in that direction.

10.5 Stage one: the dose

The first in human study escalates through five dose levels. The dose limiting toxicity (DLT) target is a rate between 16 and 33 percent, and doses with a posterior probability above 0.25 of exceeding 33 percent are not used. For transparency we show posteriors under independent \(\mathrm{Beta}(1/2, 1/2)\) priors at each dose. A two parameter logistic model with escalation with overdose control, mentioned in the companion volume, Bayesian Clinical Trials, beside the CRM and BOIN designs it treats, would borrow strength across doses and is what the protocol actually uses.

Show the R code
d <- data.frame(Dose = 1:5, Patients = c(3, 3, 6, 6, 3), DLTs = c(0, 0, 1, 2, 2))
a <- 0.5 + d$DLTs; b <- 0.5 + d$Patients - d$DLTs
d$`Pr(rate > 0.33)` <- 1 - pbeta(0.33, a, b)
d$`Pr(0.16 < rate < 0.33)` <- pbeta(0.33, a, b) - pbeta(0.16, a, b)
knitr::kable(d, digits = 2)
Table 10.1: Dose escalation data and posterior summaries under independent Beta(1/2, 1/2) priors.
Dose Patients DLTs Pr(rate > 0.33) Pr(0.16 < rate < 0.33)
1 3 0 0.11 0.18
2 3 0 0.11 0.18
3 6 1 0.20 0.37
4 6 2 0.53 0.35
5 3 2 0.89 0.09

Dose 4 has about the same probability of lying in the target interval as dose 3 but more than half its posterior mass above the limit, so it is excluded. Dose 3 is the recommended dose for Phase II. A conventional three plus three design would have reached the same conclusion here, but it would not have produced the posterior probabilities, and those are what the next stage needs: the safety model for Phase II begins from the dose 3 posterior, \(\mathrm{Beta}(1.5, 5.5)\), with mean 0.21.

10.6 Stage two: proof of concept

Phase II randomizes 100 patients to each of dose 3 and placebo. The primary endpoint is a continuous disease activity score, standardized so that the treatment effect \(\theta\) is in units of the outcome standard deviation. The trial reports \(\hat\theta = 0.30\) with standard error \(\sqrt{2/100} = 0.141\), and a one sided p value of 0.017.

Two posteriors matter. Under a flat prior, \(\theta \sim N(0.30, 0.141^2)\), with \(\Pr(\theta > 0) = 0.98\) and \(\Pr(\theta > 0.2) = 0.76\). Under a skeptical prior \(N(0, 0.2^2)\), which reflects the history of the field (most mechanisms that reach Phase II fail), the posterior is \(N(0.20, 0.115^2)\), with \(\Pr(\theta > 0) = 0.96\) and \(\Pr(\theta > 0.2) = 0.50\). The skeptical posterior shrinks the Phase II estimate from 0.30 down to the clinically relevant effect of 0.2, and cuts the probability of reaching that effect from 0.76 to 0.50. This is a quantitative statement of the winner’s curse, treated in the companion volume, the tendency of a promising Phase II estimate to overstate the true effect.

Show the R code
post <- function(est, se, prior_sd) {
  v <- 1 / (1 / se^2 + 1 / prior_sd^2)
  c(mean = v * est / se^2, sd = sqrt(v))
}
flat <- c(mean = 0.30, sd = 0.141); skep <- post(0.30, 0.141, 0.2)
rbind(flat = flat, skeptical = skep) |> cbind(
  `P(theta>0)` = 1 - pnorm(0, c(flat[1], skep[1]), c(flat[2], skep[2])),
  `P(theta>0.2)` = 1 - pnorm(0.2, c(flat[1], skep[1]), c(flat[2], skep[2]))) |> round(3)
          mean    sd P(theta>0) P(theta>0.2)
flat       0.3 0.141      0.983        0.761
skeptical  0.2 0.115      0.959        0.501

The go decision depends on what Phase III would cost and earn. We compute that next.

10.7 Stage three: sizing the pivotal trial

The pivotal trial will randomize \(n\) patients per arm and succeed if the one sided \(z\) statistic exceeds 1.96. Its power at a fixed \(\theta\) is \(\Phi(\theta\sqrt{n/2} - 1.96)\). Its assurance, the probability of success averaged over the posterior \(N(m, v)\), is

\[ A(n) = \Phi\left(\frac{m - 1.96\sqrt{2/n}}{\sqrt{2/n + v}}\right). \tag{10.2}\]

Suppose the trial costs $20 million in fixed costs plus $0.1 million per patient, so $0.2 million for each unit of \(n\), that approval follows success with probability 0.9, and that an approved drug is worth $1 billion in net present value. The expected net present value of a trial of size \(n\) is

\[ \mathrm{ENPV}(n) = 0.9 \times 1000 \times A(n) - (20 + 0.2\, n) \tag{10.3}\]

in millions of dollars. Table 10.2 reports the calculation under both posteriors.

Show the R code
A <- function(n, m, v) pnorm((m - 1.96 * sqrt(2 / n)) / sqrt(2 / n + v))
enpv <- function(n, m, v, value = 1000) 0.9 * value * A(n, m, v) - (20 + 0.2 * n)
n <- c(200, 300, 400, 500, 600, 800, 1000)
tab <- data.frame(n = n, Cost = 20 + 0.2 * n)
for (p in list(list("Flat", 0.30, 0.141^2), list("Skeptical", 0.20, 0.115^2)))
  tab[paste(p[[1]], c("power", "assurance", "ENPV"))] <- list(
    pnorm(p[[2]] * sqrt(n / 2) - 1.96), A(n, p[[2]], p[[3]]), enpv(n, p[[2]], p[[3]]))
knitr::kable(tab, digits = c(0, 0, 2, 2, 0, 2, 2, 0))
Table 10.2: Sizing the pivotal trial. Power is evaluated at the posterior mean; money in millions of dollars.
n Cost Flat power Flat assurance Flat ENPV Skeptical power Skeptical assurance Skeptical ENPV
200 60 0.85 0.73 594 0.52 0.51 399
300 80 0.96 0.80 644 0.69 0.61 470
400 100 0.99 0.85 662 0.81 0.68 508
500 120 1.00 0.87 665 0.89 0.72 527
600 140 1.00 0.89 661 0.93 0.75 535
800 180 1.00 0.91 640 0.98 0.79 533
1000 220 1.00 0.92 612 0.99 0.82 517

Three features of the table matter for practice.

Power at the estimate overstates the chance of success. Under the flat posterior, a trial of 300 per arm has 96 percent power at \(\theta = 0.30\) but only 80 percent assurance, because the posterior puts substantial weight on smaller effects. Under the skeptical posterior the gap is smaller in absolute terms but the level is much lower. A sponsor that sizes Phase III by power at the Phase II estimate is planning for the best case.

The optimum is flat and the prior moves it. The flat posterior’s ENPV peaks near 500 per arm (exactly at 482); the skeptical posterior’s peaks between 600 and 700 (exactly at 671, with an ENPV of about 537 million dollars). Both curves are flat over a wide range, so a trial between 400 and 800 per arm loses at most about 30 million dollars either way: using \(n = 500\) under the skeptical posterior costs under 10 million dollars of ENPV. The skeptical sponsor runs a larger trial, because it is less sure the effect is large and needs more information to detect a smaller one.

The go decision is easy here. Under both posteriors the ENPV at the optimum is several hundred million dollars, so the program should proceed. A crowded indication with a value of $300 million instead of $1 billion would cut the skeptical ENPV at 600 per arm to \(0.9 \times 300 \times 0.75 - 140 = 62\), still positive but thin, and the decision would depend on the cost of capital and on alternative uses of the budget, the portfolio question of Chapter 13.

Show the R code
c(optimum_flat = which.max(enpv(50:2000, 0.30, 0.141^2)) + 49,
  optimum_skeptical = which.max(enpv(50:2000, 0.20, 0.115^2)) + 49,
  crowded_market = enpv(600, 0.20, 0.115^2, value = 300))
     optimum_flat optimum_skeptical    crowded_market 
        482.00000         671.00000          62.53104 

10.8 Stage four: monitoring the pivotal trial

The sponsor chooses 600 per arm and a monitoring plan with an O’Brien and Fleming boundary for the regulator, and posterior and predictive probabilities for the monitoring committee, as described in the companion volume. With a continuous endpoint, the interim at half information reports \(\hat\theta_1\) with standard error \(\sqrt{2/300} = 0.082\). The predictive probability of final success, from the skeptical Phase II posterior updated by the interim data, is the natural futility criterion.

Suppose the interim estimate is \(\hat\theta_1 = 0.15\). The skeptical posterior, combining Phase II and the interim, has precision and mean

\[ \frac{1}{s_2^2} = \frac{1}{0.115^2} + \frac{1}{0.082^2}, \qquad m_2 = s_2^2\left(\frac{0.20}{0.115^2} + \frac{0.15}{0.082^2}\right), \]

which gives \(m_2 = 0.167\) and \(s_2 = 0.067\). The final boundary is 1.98 on the \(z\) scale, so the trial succeeds if the estimate from all 600 patients per arm exceeds \(1.98\sqrt{2/600}\), which requires the second half estimate \(\hat\theta_2\) to exceed \(2 \times 1.98\sqrt{2/600} - 0.15\). The second half estimate has predictive distribution \(N(m_2, s_2^2 + 0.082^2)\).

Show the R code
s2 <- 1 / sqrt(1 / 0.115^2 + 1 / 0.082^2)
m2 <- s2^2 * (0.20 / 0.115^2 + 0.15 / 0.082^2)
need <- 2 * 1.977 * sqrt(2 / 600) - 0.15
c(m2 = m2, s2 = s2, pred_success = 1 - pnorm(need, m2, sqrt(s2^2 + 0.082^2)))
          m2           s2 pred_success 
  0.16685298   0.06676535   0.79886758 

The predictive probability of crossing the final boundary is 0.80, high enough to continue. An interim estimate near zero would have triggered a futility discussion, and the predictive probability, not the conditional power at the design effect, would have been the quantity to discuss.

Should Phase II data enter the Phase III analysis? In this example the regulator analyzes the pivotal trial on its own data, with a flat prior in effect, and the O’Brien and Fleming boundary controls its type I error. The sponsor, deciding whether to continue, should use everything it knows. These are different decisions and can rightly use different priors. The companion volume asks that the regulator’s prior be stated in full, with its effective sample size and sensitivity analyses; it does not ask that it be the sponsor’s prior.

10.9 Stage five: the label and the price

Suppose the pivotal trial succeeds with a final estimate of 0.22 and standard error 0.058. The label rests on the regulatory posterior, with a flat prior, which is \(N(0.22, 0.058^2)\), with \(\Pr(\theta > 0.2) = 0.63\). The payer is not bound by the regulator’s prior and uses everything the sponsor knows: the skeptical Phase II posterior \(N(0.20, 0.115^2)\) combined with the final result gives \(N(0.216, 0.052^2)\), with \(\Pr(\theta > 0.2) = 0.62\). The payer now asks the question of Chapter 11: at the proposed price, is the drug cost effective, and is further evidence worth buying?

Suppose the disease activity effect maps to quality adjusted life years (QALYs) at 0.25 QALYs per unit of \(\theta\) over the treatment horizon, so the expected QALY gain is \(0.25 \times 0.216 = 0.054\) with standard deviation \(0.25 \times 0.052 = 0.0129\). At a price that gives incremental cost \(\Delta C = \$4000\) per patient and willingness to pay \(\lambda = \$100\,000\) per QALY, the net monetary benefit \(\mathrm{NMB} = \lambda\,\Delta E - \Delta C\), where \(\Delta E\) is the incremental QALYs, has mean \(100\,000 \times 0.054 - 4000 = \$1400\) and standard deviation $1290, so \(\Pr(\mathrm{NMB} > 0) = 0.86\). The expected net monetary benefit is positive, so adoption at this price is the Bayes action; the probability describes the uncertainty around that decision and does not choose the action. A payer that wants a probability of at least 0.9 as its negotiating position can ask for a lower price: at \(\Delta C = \$3600\) the probability is 0.92, and 0.90 is reached at \(\Delta C\) of about $3740.

Show the R code
s_pay <- 1 / sqrt(1 / 0.1152^2 + 1 / 0.058^2)
m_pay <- s_pay^2 * (0.2004 / 0.1152^2 + 0.22 / 0.058^2)
inb_prob <- function(dC, lambda = 1e5, mu = 0.25 * m_pay, sd = 0.25 * s_pay)
  pnorm((lambda * mu - dC) / (lambda * sd))
c(m_pay = m_pay, s_pay = s_pay, p_above_0.2 = 1 - pnorm(0.2, m_pay, s_pay), nmb_mean = 1e5 * 0.25 * m_pay - 4000, nmb_sd = 1e5 * 0.25 * s_pay, price_4000 = inb_prob(4000), price_3600 = inb_prob(3600),
  price_for_0.9 = uniroot(function(d) inb_prob(d) - 0.9, c(3000, 4500))$root)
        m_pay         s_pay   p_above_0.2      nmb_mean        nmb_sd 
 2.160364e-01  5.180463e-02  6.215506e-01  1.400910e+03  1.295116e+03 
   price_4000    price_3600 price_for_0.9 
 8.603043e-01  9.178175e-01  3.741153e+03 

The negotiation is a negotiation over a posterior.

10.10 The program as a chain of inferences

Read end to end, the program is a chain of linked inferences and five decisions: the dose, the go decision, the size, the interim and the price. Prior knowledge of the mechanism and the field enters at Phase II. The Phase II posterior drives the go decision and sets the size of Phase III and its assurance. The interim analysis updates the posterior and decides whether to continue. The final result updates it again. By design, the regulator’s label decision uses the Phase III data alone, and the payer’s acceptability calculation turns the sponsor’s updated posterior into a price. Only the regulator sets Phase II aside, and it does so by choice.

The conventional program makes the same five decisions with less information at each: the dose from a rule that produces no probabilities, the go decision from a p value, the size from power at the estimate, the interim from conditional power at the design effect, and the price from a point estimate. The difference is not that one program is Bayesian and the other is not. Both use priors, implicitly or explicitly. The difference is that one program writes its priors and utilities down, and can therefore check them.

TipKey points
  • The cost per approval is the expected cost per start divided by the probability of approval, so failures dominate the cost of a successful drug.
  • rNPV weights cash flows by the probability the program is alive; with posterior transition probabilities it is a Bayesian quantity that jumps at each readout.
  • Each phase is a real option: abandonment has value, and the Phase II to III transition is the dominant decision.
  • Power at the Phase II estimate overstates the chance of success; assurance averages over the posterior, and in this example a skeptical prior lowers it and raises the optimal size of the pivotal trial.
  • The ENPV curve is flat near its optimum, so the choice of \(n\) matters less than the choice of posterior.
  • An efficacy posterior carried through the go decision, sizing, monitoring and pricing keeps information that a sequence of separate tests discards.
TipDiscussion questions
  1. Fit a two parameter logistic dose toxicity model to Table 10.1 with a weakly informative prior and recompute the probabilities in the last two columns. Does the recommended dose change?
  2. Derive Equation 10.2 and show that \(A(n)\) tends to \(\Phi(m/\sqrt v)\), the posterior probability that \(\theta > 0\), as \(n \to \infty\).
  3. Find the ENPV maximizing \(n\) under the skeptical posterior when the market value is $300 million, and compare it with the optimum at the original value.
  4. Verify the predictive probability of 0.80 at the interim in stage four, and recompute it with the flat Phase II posterior.
  5. In stage five, suppose the QALY mapping coefficient is uncertain, \(N(0.25, 0.05^2)\). Recompute \(\Pr(\mathrm{NMB} > 0)\) and the expected value of perfect information per patient at \(\Delta C = \$4000\).
  6. Rerun the program with a value of $300 million. At which stage, if any, should the sponsor stop?